Per Diem
Civil Surveyor — Pampa, TX
About This Role
Civil Surveyor needed on a large-scale data center construction in Pampa, TX. This is hands-on field work: you’ll run surveys, verify elevations and grades, perform layout and staking, and keep measurements accurate through all phases of construction. Pay starts at $30+/hr with per diem. You’ll work on an active site alongside concrete, civil, and utility crews. Expect outdoor work, travel to site, and a steady schedule while the project is active. Strong attention to detail, safe work habits, and reliable equipment operation are a must.
What You'll Do
- • Perform field surveys using total station, GPS, level, and hand tools on an active data center construction site
- • Verify site elevations, slopes, grades, and horizontal/vertical dimensions per plans
- • Assist with layout and staking for foundations, utilities, roads, and site features
- • Record and maintain accurate survey notes, measurements, and as-built data throughout construction phases
- • Coordinate with foremen and engineers to resolve discrepancies and ensure layout accuracy
- • Maintain and care for survey instruments and basic field equipment
What We're Looking For
- • Hands-on land surveying experience on commercial construction sites
- • Ability to read and interpret civil drawings, technical drawings, and blueprints
- • Experience with site layout, staking, and verifying elevations/grades
- • Proficiency with total station, GPS survey equipment, and basic field tools
- • Physically able to work outdoors, walk uneven terrain, and lift equipment as needed
- • Reliable transportation and ability to travel to Pampa, TX; willing to work extended or overtime as required
Qualifications
- • Valid driver's license (required)
- • OSHA 10-hour Construction Safety card (preferred)
- • Certified Survey Technician (CST) Level I or II (preferred)
- • First Aid/CPR (preferred)
- • Proven experience with total station/GPS and data collection software
- • English required; Spanish a plus
What We Offer
- • Competitive pay starting at $30+/hr (depends on experience)
- • Per diem while on assignment in Pampa, TX
- • Overtime pay as applicable and steady, long-duration project work
- • Weekly pay and direct deposit available
- • PPE and basic field tools provided; safety training on site
- • Opportunity to gain data-center construction experience and work with experienced crews
Ready to Apply?
Create your Skillit profile and let Sam, your AI assistant, connect you with top contractors.
Not Another Job Board
Skillit connects craft workers directly with contractors hiring for your trade. No resumes, no chasing listings. Build your profile once and let jobs find you.
- Get discovered automatically: Contractors search for talent like you every day.
- No more chasing listings: Skillit surfaces your profile when a job matches your skills and certs.
- Sam does the legwork: Your craft hiring assistant works 24/7 to connect you with active hiring contractors.