Misael Alanis, Heavy Equipment Operator
Lead operator @ Caddo midland TX
Rio Grande City, TX
Languages:English
Languages:English
2024 - Current
Demolition on old oil field pads. Remove caliche. Turn soil around, what ever caliche is left at the bottom. Slick out with the motorgrader. Till a smoth finish is done.
4 months starting in 2023
Pipeline opening right of way on a dozer.Bending pipe. Main line on a side boom. Clean up on a motergrader/ balde
6 months starting in 2022
Gps dozer, locating where to make my cuts, to grade level. Above or below 2 tenths of the margin. Off road trucks moving dirt. Point A to pint B. Roller contacting dirt.
Heavy Equipment
Safety & Security
Are you sure you want to discard your changes?